Food Processing – Coffee Roasting Plant

Updated on Thursday 15 July 2021, 10:06 AM

1 Minute Read

From its Roastery Plant in London, our client supplies the coffee to all its coffee houses worldwide. TPS360 were instructed to install a high-quality flooring to cover a 1,480m² area. The system needed to be durable, sustainable with thermal capabilities of up to 70 C.

Preparation:

The substrate was prepared using our 950Rx planetary grinding machine and edge grinder, removing contaminants and weakness to give a clean, sound load bearing surface.

Priming:

The prepared concrete received a priming coat of Epoxy ST100 by roller.

Self-Smoothing Topping:

The primed surface was coated with Remmers Epoxyflex Coating PH as a flow system to the desired thickness. Applied by trowel and spike roller in two directions to release air and give a smooth surface. Addition of Accelerator PH to reduce walk on time to 4 hours.

System Properties
•Flexible
•High Sheen
•Tough
•Smooth and Seamless
•Hygienic
•Durable
•Easy to Clean
•Good Chemical Resistance
•Wide Colour Range
•Fast Cure is Possible

TPS360 is a proud member of the FactoryNOW initiative

Most Read

Press Kit

To obtain a copy of our press kit, please message us using the adjacent contact form.

Contact

Thank you, we will be in contact shortly.

AMRC Sheffield
Boeing
Bott
University of Wolves Racing
Mach Exhibition

Are you enjoying this article?

Sign up to our email newsletter and don't miss out on more articles like this.

* indicates required

Do you give consent for MTDMFG to send you communications?

You can unsubscribe at any time by clicking the link in the footer of our emails.